Top Cucina Kit Carrara Marble Effect with Epoxy Resin: The 2.4 kg kit (1.6 + 0.8) covers 1 square meter (+ 10 g white metallic pigment + 25 ml white dye +25 ml black dye) The 4 kg kit (2*1.6 + 0.8) covers 2 square meters (+ 2*10 g metallic pigment +2* 25 ml white dye + 2*25 ml black dye) The 8 kg kit covers 4 square meters (+ 4*10 g metallic pigment +4* 25 ml white dye+ 4*25 ml black dye) The 16 kg kit covers 8 square meters (+ 8*10 g white metallic pigment +8* 25 ml white dye 8*25 ml black dye) Kit Contents: 2.4kg, 4kg, 8kg or 16kg of "Art Pro" Epoxy Art Coat for a high quality base White dyeand Black of the "Colorfun" line for the perfect stone shades White Metallica Sahara pigment for that extra touch of sparkle Good to add: To enhance the appeal of the design:: Isopropanol 99.9% (additional option, not included in the price) To make the coating last longer: Polishield 100 Gloss (additional option, not included in the price). The coverage of a 0.5 kg kit is approximately 4 m2 Each kit includes dyes and pigment in sufficient quantity for the amount of resin required. HOW TO CREATE YOUR MARBLE EFFECT WITH EPOXY Guide Instructions: Step N1: Primer Start by carefully measuring the amount needed to cover the surface based on the consumption of 150 g/m2, making sure to follow the proportions indicated to obtain a homogeneous mixture. Once the base has been prepared, proceed with adding the dye, choosing between white or black depending on your needs. The quantity of colourant to add to the mixture can be measured in a few drops (max 5% by volume). This step is crucial to achieve the desired colour and ensure uniformity of the application. Before applying the primer, it is essential that the surface intended for treatment is adequately prepared. Sand the surface with a coarse grit (40 or 60) before any operation. Make sure it's completely clean, using a soft cloth or brush to remove any pigment, dirt or debris. The surface must also be completely dry; residual humidity can compromise the adhesion of the primer and its effectiveness in sealing the surface. Once the surface is ready, apply the mixture evenly, using a suitable tool such as a brush, roller or spatula, depending on the size of the area to be treated and your personal preference. The key is to get a thin, even layer that can cover the entire area without leaving gaps or excessive product buildup.. After application, it is essential to allow the primer to dry completely before proceeding with further treatments or finishes on the surface. The recommended waiting time is 12 hours; this range may vary slightly depending on environmental conditions, such as humidity and temperature, but offers a good compromise to ensure the mixture has time to dry and adhere properly. During this period, avoid touching or stressing the treated surface to ensure optimal results. Don't worry if you notice any discrepancies on the surface, the next main pour will level everything perfectly. Step N2: application Start by applying masking tape around the perimeter of your countertop to contain the epoxy you're about to pour. This step is essential to ensure the resin stays where it is needed. After applying the resin, wait about 1.5 hours before gently removing the tape. To ensure coverage is even and complete, plan to use approximately 1.6kg of resin for every square meter of surface area. When you are ready to mix the resin, use a drill equipped with a paddle mixer for quick and even action (use at low speed), taking about 2 minutes for this operation. If you prefer to mix by hand, be prepared to take double the time. Don't forget to scrape the sides and bottom of the container halfway through the process with a stick to ensure all the material is mixed well. Next, separate the already mixed resin into different glasses and add the desired colours, mixing the different colours in the different glasses until you obtain an intense and uniform colour per single glass. To create a striking visual effect, pour the coloured resin in random layers into a larger bucket, being careful not to mix the colours together too much. After filling the bucket, spread the contents over the surface of the worktop, leaving a small amount of resin aside to finish the edges later. To remove trapped air bubbles, gently run a propane torch or heat gun over the surface. Once the adhesive tapes have been removed, approximately 1.5 hours after application, if there are any dry edges, moisten them slightly by wearing a protective glove to promote an even appearance. Use appropriate tools, such as spatulas or plastic scrapers, to spread and level the resin along the edges, making sure to cover the entire area well. After letting the resin cure for 24 hours, you can apply a clear top coat or PoliShield scratch-resistant paint to further protect the surface. Finally, for even more refined visual effects, spray 99.9% isopropyl alcohol onto the surface just before the resin begins to fully harden. This will create unique lacy textures. Remember that when you remove the tape, it is essential that the resin is partially hardened, neither too liquid nor completely solid, to avoid unwanted drips. Attention! Safety Guidelines for Using Isopropyl Alcohol (99.9%) Isopropyl alcohol (IPA) is a highly flammable substance. Improper use—especially near heat sources like torches or heat guns—can result in fire or explosion. To ensure safe use, follow these precautions: Primary Risks Highly flammable: IPA vapors can ignite from sparks, open flames, or hot surfaces. Forms explosive vapor-air mixtures, especially in enclosed or poorly ventilated spaces. Strictly Prohibited: Using gas torches or heat guns near areas treated with IPA. Spraying IPA near active heat sources. Storing IPA near flames, heaters, or hot tools. Recommended Safety Measures: 1. Ventilation: Always work in a well-ventilated area when using IPA. 2. Wait Time: After applying IPA, wait at least 5–10 minutes to allow complete evaporation before using any heat tools. 3. Safe Distance: Keep IPA containers at least 2 meters (6 feet) away from heat or flame sources. 4. Storage: Store IPA in a tightly sealed container, away from direct sunlight or high temperatures. 5. Fire Safety: Have a CO₂ or dry chemical fire extinguisher nearby when working with flammable substances and open flames. In Case of Fire: Do not use water to extinguish the fire. Use an appropriate extinguisher, cut off air supply if safe, and call emergency services if needed.
$371,95
The best choice for Resin and Geode-art, making Coasters, Trays, Ocean-art, jewellery and casting surfaces.
+ gloves & detailed instruction for FREE.
$33,85
The best choice for deep pouring:
✔️ Low exothermic reaction –> Castings up to 5cm [1,96”]
✔️ Strong UV filters –> Non-yellowing guaranteed for 5 years
✔️ Highly mechanical resistant surface, for maximum scratchproof properties
✔️ Low viscosity –> Bubbles free
✔️ Long working time –> No rush in the process
✔️ Heat resistance –> Up to 70°C [158 F]
✔️ Trusted quality –> We have already sold more than 26000 kits of this product, since we started in 2015
🌿 Cruelty Free, Vegan Friendly🐹
$16,85
✔️ Perfect transparency -> A true liquid crystal
✔️ High scratch resistance -> Ideal for tables!
✔️ UV filter for protection against yellowing -> 10 years warranty.
✔️ Heat Resistance (Up to 70°C)
✔️ Easy to use -> 2:1 mixing ratio
✔️ Odourless
✔️ 1,5сm layer per application
🌿 Cruelty Free, Vegan Friendly🐹
$11,65
How Long Does It Take to Install 100 sqm of Flooring?
The time it takes to install 100 sqm of flooring can vary depending on various factors such as the type of flooring, subfloor preparation, and the expertise of the professional or DIY enthusiast. Here are some considerations to keep in mind:
Subfloor Preparation
Properly preparing the subfloor before laying the flooring is crucial. This process may involve cleaning, leveling, and applying primers or protective layers. The duration required for this step depends on the initial condition of the floor.
Type of Flooring
The time needed to install 100 sqm of flooring varies based on the material chosen. For instance, laying ceramic tiles may take longer compared to laminate or parquet flooring.
Installation Method
The installation method selected can impact the time required. For example, installing laminate flooring with a click-lock system may be quicker than a traditional glue-down installation.
Experience:
An experienced professional is likely to install the flooring faster than a novice. Experience plays a significant role in reducing installation times.
Assistance:
Having assistance from others, such as lifting heavy materials or cutting tiles, can expedite the installation process.
In general, under average circumstances, laying 100 sqm of flooring may take one to three days for a professional, while a DIY enthusiast might take longer depending on their skills and the complexity of the project.
Factors Influencing Flooring Installation Time:
Several key factors can influence the time required to lay flooring effectively. Here are some of the main factors to consider:
Type of Flooring:
The installation time varies depending on the type of flooring chosen, such as ceramic tiles, parquet, laminate, or linoleum, each with its unique installation procedures.
Subfloor Preparation:
Well-prepared subfloors are essential for a successful flooring installation. Tasks like removing old coverings, leveling the ground, and applying primers can impact the overall installation time.
Room Size and Shape:
Rooms of varying sizes or with irregular shapes may require more time for installation, especially in tight corners or complex areas.
Complexity of Design:
Intricate designs, like inlays or decorative patterns, will naturally take longer to install compared to simple designs.
Installer's Experience:
An experienced professional can work more efficiently than a DIY enthusiast due to their knowledge of correct techniques and effective problem-solving skills.
By carefully considering these factors and planning the installation process thoroughly, a high-quality and durable end result can be achieved over time.
How Long Does It Take to Install 100 sqm of Wooden Flooring?
The time needed to install 100 sqm of wooden flooring can vary based on several factors. Here are some details to take into account:
Base Preparation:
Properly preparing the base before laying wooden flooring is essential. This process may take between 1 to 3 days, depending on the condition of the existing floor.
Wood Acclimatization:
Wood needs to acclimatize to the installation environment to prevent moisture-related issues. This phase may last between 2 to 7 days, depending on climate conditions.
Flooring Installation:
The actual installation of wooden flooring depends on the chosen method (glued, floating, or nailed) and the surface area to cover. Typically, 2 to 5 days may be needed for 100 sqm.
Finishes and Additional Works:
Additional time may be necessary post-installation for final touches like sanding, varnishing, or applying protective oils.
Overall, considering all the above phases, the estimated time to install 100 sqm of wooden flooring can range from approximately 5 to 15 days, depending on specific circumstances and the complexity of the work.
Accelerating the Flooring Installation Process:
It is possible to expedite the flooring installation process by following some tips and utilizing specific products that facilitate the operation. Here are some useful suggestions:
Surface Preparation:
Ensure the floor is clean, smooth, and free of dust and dirt. Repair any cracks or holes before proceeding with the installation.
Use of Quick Adhesives:
There are adhesives formulated to speed up the flooring installation process. These adhesives have faster setting times, allowing for quicker progress.
Epoxy Resins:
Epoxy resins are ideal for accelerating the flooring curing time. These coatings create a durable surface in a reduced time compared to other solutions.
Quick-Drying Silicones:
To seal joints and cracks between floor tiles, it is advisable to use quick-drying silicones. This reduces the waiting time before the floor can be used.
By following these tips and utilizing the appropriate products, it is possible to accelerate the flooring installation process, achieving quality results in less time.
Intense and brilliant colour, ideal for Transparent Epoxy Resins. Mix small quantity to get a translucent effect. The high coverage of the "Colorfun Original" range allows to obtain a full and bright colour. The high concentration provides an opaque colour with a few drops. Usable to colour the products of the RESIN PRO range.
$13,45
“I-GUM SLOW” – Non-Toxic Silicone Rubber – Paste Form
Pasty silicone rubber “I-GUM” is a two–component product for creating moulds and forms for pouring with epoxy resin.
$22,85
Create your moulds using PURE MOLD silicone rubber! Compatible with many materials including resins, plaster and cement. Its transparency will allow you to observe through the mould and its high mechanical characteristics make it a product suitable for both professional and hobby use.
$22,45
EPOXY POLISH is an advanced epoxy resin polishing system that delivers a stunning, glossy finish for your resin projects. Ideal for professionals and DIY enthusiasts alike, this product rejuvenates surfaces to a mirror-like shine with ease.
$17,85